Damp and mould survey and reporting software for UK social housingFrom damp and mould inspection to verified closure.
One case record that carries the surveyor's evidence through office review, the resident's summary, the remedial schedule and the reinspection, so each action stays visible until it is resolved.


Damp and mould cases rarely fail at the inspection. They stall between teams, when the evidence, the letter to the household and the works order no longer agree. Survey Smarter Housing keeps them in one record, written for each reader.It is built for housing associations, local authority housing teams and the surveying and repairs contractors who work for them: the surveyor records the evidence, the office reviews and issues it, and the repairs team receives actions that trace back to each finding.
- 14
- inspection findings
- 12
- linked remedial actions
- 4
- reports for different readers
- 54
- pages, all viewable below
In the worked sample case
The case journey
Five stages. One record.
Illustrated with pages from the fictional sample case. Each stage below is shown exactly as it appears in the generated reports.
- 01
Surveyor, on site
Survey evidence
Start outside, then move room by room. Each finding carries its photographs, readings and a recommended next step. The summary and limitations are written last, once the whole home has been seen.
In the sample · F06 · Bathroom: the extractor fan did not operate in the switched test. The inspection does not establish why.

- 02
Office, before issue
Office review
The office checks the record before it leaves the building. Revisions are numbered and the approved version is the one that is issued, so everyone works from the same document.
In the sample · Document control: approved revision 1, fictional reviewer, with the scope stated before any finding.

- 03
Household
Resident communication
A separate plain-language summary explains what was found, what the household can do now and who is arranging the work, without the internal technical narrative.
In the sample · Kitchen: “The kitchen fan needs cleaning and performance checks.” Next step: “Have the kitchen fan cleaned and its operation checked.”

- 04
Repairs team or contractor
Assigned remedial work
Every recommendation becomes a linked action with a responsible team, a programme target and a status. Nothing disappears between the report and the works order.
In the sample · 12 linked actions in the sample: some complete, some in progress, some still open.

- 05
Surveyor and reviewer
Reinspection
The follow-up records what was verified and what remains outstanding. A case is closed when the evidence supports it, not because a date has passed.
In the sample · A01 recorded complete, with post-rainfall verification still required. A02 and A03 remain open, so the case stays open.

Sample reports
Four reports from one inspection.
Complete documents generated by the report engine from the same fictional case. Every page is here; open or download any PDF.These four reports are examples only. A trial is a separate conversation with your team.What each sample report covers and who it is for
Inspection scope, executive summary, environmental readings, room-by-room findings, evidence and recommended actions.
Full Technical Report: page 1 of 31
Roles
A separate workspace for each job.
Surveyors don't need the office queue, and nobody doing casework needs organisation settings. This is how the workflow is designed; team access is set up with each organisation and is not open from this website.
Surveyor
Capture and write up.
- External then internal findings
- Photographs and readings on each finding
- Summary and limitations at the end
- Their own allocated jobs only
Office
Allocate, review, follow through.
- Allocation and review queue
- Approved report revisions
- Remedial actions and owners
- Follow-up visits and outcomes
Admin
Run the organisation.
- Organisation settings
- Team membership and roles
- Kept apart from casework
- Owner-level access only
How the reports are written
Say what was seen. Say what wasn't.
- Scope first
- Each report states the instruction, access limits and what could not be inspected before any finding.
- Evidence, not conclusions
- Observations, readings and photographs are recorded as found. Causes are only stated where the evidence supports them.
- Open until verified
- The follow-up keeps unresolved work visible. An interim revisit is not a clearance certificate.
- Judgement stays professional
- The surveyor and reviewer remain responsible for the assessment. The platform does not certify statutory compliance.
14-day trial
Try the full case journey with your team.
Send a trial request and we'll arrange it with you: the sample case, the four reports, and how the surveyor, office and admin roles fit your inspection, repairs and follow-up process.
